Joshimath Crises - Strictly Enforce Construction Ban, Submit Report To Prevent Further Damage: Uttarakhand HC

Posted in: Civil Laws
Sun, Jan 15, 23, 17:51, 1 Year ago
star star star star star
0 out of 5 with 0 ratings
comments: 0 - hits: 5165
PC Tewari v/s Uttarakhand directed the State Government to strictly enforce the ban on construction in the subsidence-hit Joshimath town in the Chamoli district.

It is most significant to see that while ruling on a most important ruling pertaining to Joshimath which is in the news for cracks in buildings, roads and other places, the Uttarakhand High Court has in a most learned, laudable, landmark and latest judgment titled PC Tewari Vs State of Uttarakhand and others in WPPIL No. 67 of 2021 that was pronounced as recently as on January 12, 2023 has directed the State Government to strictly enforce the ban on construction in the subsidence-hit Joshimath town in the Chamoli district.

At the very outset, this brief, brilliant and balanced judgment authored by Hon’ble Mr Chief Justice Vipin Sanghi for a Division Bench of the Uttarakhand High Court comprising of himself and Hon’ble Mr Justice Alok Kumar Verma sets the ball in motion by first and foremost putting forth in para 1 that:
Issue notice”. The Bench then states in para 2 that:
Learned counsels for the respondents as noted hereinabove, appear and accept notice.”

To put things in perspective, the Division Bench envisages in para 3 rightly that:
The present application has been moved by the petitioner in the wake of the recent geological developments, which have taken place in Joshimath area. The phenomena of land subsidence, and landslides, which have recently occurred in the townships of Joshimath and Raini, as well as Tapovan, have led the petitioner to file this application in the present petition, which has been pending since the year 2021. The original cause for filing this Writ Petition was the incident of 07.02.2021, when due to the bursting of a glacier, the Hyrdo Electric Power Projects on Rishi Ganga River, namely the Rishi Ganga Hydro Power Project and the N.T.P.C’s Tapovan Vishnugad Hydropower Project on Dhauliganga River, suffered sudden flooding, leading to death of hundreds of people.”

As we see, the Division Bench then points out in para 4 that:
Apart from seeking relief in relation to the said incident, the petitioner also sought directions to restrain the respondents from undertaking operations in under construction Hydro Power Project sites across Uttarakhand, till early warning systems are established, as recommended by the ISDR Study. The petitioner also sought a direction to respondent no. 9 for formation of an Expert Committee to review impact in all the Hydro Power Projects located on upper reaches of the rivers across the State of Uttarakhand in order to recommend sustainable solutions for its management or removal.”

Quite pertinently, the Division Bench then specifies in para 5 that:
Along with the present application, the petitioner has placed on record the extract of a report published in the year 1976 by a Committee, popularly known as the “Mishra Committee Report” under the Chairmanship of Shri Y.C. Mishra, the then Commissioner of the Garhwal Division.”

It is worth noting that the Division Bench then lays bare in para 6 that:
As early as in the year 1976, the Mishra Committee Report, reported that Joshimath is sitting on rock and silt, accumulated as a result of landslides. It does not have a solid and a stable foundation. The report, inter-alia, states “Joshimath is a deposit of sand and stone – it is not the main rock – hence it was not a suitable place for the coming up of a township. Vibrations produced by blasting and heavy traffic will also lead disequilibrium in natural factors”. The said Report warned against undertaking of construction projects. The remedial measures suggested in the said report, inter alia, were that restrictions should be laid on heavy construction work. Construction should be allowed after examining the load bearing capacity of the soil.”

Furthermore, the Division Bench then observes in para 7 that:
The further recommendation contained in the Report was as follows:
“For road repairs and other construction purposes it would be advisable not to remove boulders by digging or blasting the hill side. In the landslide areas stones und boulders should not be removed from, the bottom of the hill, as it will result in removing too support expediting landslide from stones may be procured from the boulders lying at hill tops or away from slip/slide zones. Cutting of trees for supplying the township with timber, firewood and charcoal may be strictly regulated and no tree should be felled in the landslide area. It will be imperative to provide the local people with alternate areas of fuel supply such as electricity, soft coke, cooking gas, kerosene oil etc.

Unless suitable alternatives to firewood fodder and charcoal are provided it will not be possible to have an effective check on falling and lopping of trees. This holds equally good for the effective protection of plantations which exists or will be raised in future. State civil supply authorities, Ministry of Defence and Ministry of Home may be approached for making adequate arrangements in respect of the above requirements. Fuel and timber arrangements for army, DGBR and Para military forces should be made by respective departments. State Civil Supply authorities will contribute a lot in saving trees in the area by establishing dealers in cooking gas, kerosene etc.

Agriculture on slopes must be avoided. Instead a massive campaign to plant trees and grass should be undertaken to conserve soil and water resources. An extensive programmed of tree plantation in reserved forest areas, civil bonna p land, cant area and on the period 1976-77 to 1980-81 in the area has been prepared by the department.

This programmed aims at planting trees in one hundred twenty hectares of reserved forest at the rate of 1200 trees per hectare, 180 hectares of civil benaap land at the rate of 1200 trees per hectare and in addition cantonment and habitated areas have also be included where trees will be planted at the rate of 5000 per annum. This programme will cost Rs.9,24,000/- extending over five years. The programmed for plantation of trees is both a short term as well as a long term measure. A seed which is planted today will take years to grow up and must be sown immediately without losing time.

For its proper growth it must be brought up like a child otherwise it will be a waste. Trees which grow fast should be planted immediately in the most vulnerable packets. Plantation of trees on all slopes steeper than 30 will be a great stabilising factor. The area where tree plantation should be undertaken immediately are bare peaks and slopes, military camping ground, Marwari, Belt along Alaknanda, Vishnuprayag and Dhauli Ganga, and Area Khon.””

Quite damningly, the Division Bench then reveals in para 8 that:
The said Report, it appears, fell on deaf ears, and was not put into action. The petitioner has also placed on record another Article dated 25.05.2010, prepared by Shri M.P. Bisht and Shri Piyush Rautela of H.N.B. Garhwal University, Srinagar (Garhwal) of the Disaster Mitigation and Management Centre. This Article refers to the earlier report prepared by the Mishra Committee and, inter-alia, states as follows:-

“Despite being fully aware of the geological/environmental vulnerability of the area, a number of hydroelectric schemes have been sanctioned around Joshimath and Tapovan. The Vishnugad HE Project is one such scheme. The head race tunnel of the project traverses all through the geologically fragile area below Joshi math. It is interesting to note that a private company was preferred by National Thermal Power Corporation (NTPC) over the Geological Survey of India, for undertaking geological investigations related with the project. These investigations failed to take cognizance of the earlier geological investigations carried out in the area and did nothing to establish the depth of overburden all through the tunnel alignment.

A tunnel boring machine (TBM) was employed for excavating the head race tunnel. On 24 December 2009, it punctured a water-bearing strata some 3 km inward the left bank of Alaknanda near Shelong village. The site was more than a kilometer below the surface, somewhere below Auli, according to the project authorities. The water discharge was reportedly between 700 and 800 litres per second. The aquifer discharge was about 60-70 million litres daily, enough to sustain 2-3 million people. Even after a month, the aquifer had not dried out. What a waste of the scare resource!

Sudden outpouring of water from a aquifer will have multifarious impacts but it would be a little early to dwell upon full implications of the same. The water draining out through the tunnel would result in drying up of springs around. Habitations around Joshimath would face shortage of drinking water during the summer season. It is important to note that depletion in spring discharge and untimely drying up of a few springs have already been reported. This sudden and large scale dewatering of the strata has the potential of initiating ground subsidence in the region, thereby augmenting the problems of the masses living in the area. Reduced ground moisture regime would result in depleted biomass availability and crop produce that would adversely affect the life support strategy of the masses. It would also impact floral and faunal diversity.””

Most lamentably, the Division Bench then so very rightly points out in para 9 that:
Even this Report, it appears was consigned to the record, without any serious note being taken thereof. The result of such indifference, to the Reports prepared by experts, is therefor all to see. From media reports, it appears that the Central Government and the State Government are now trying to salvage the situation, insofar as, it relates to people, who are residents of Joshimath, and the neighbouring areas which are affected by the land subsidence.”

On a practical note, the Division Bench then hastens to add in para 10 stating that:
While such steps are called for and should be taken in full swing, it is essential that concerned experts in the field should make a study of the situation existing in the Joshimath area to make an assessment of how the situation can be salvaged, and further damage can be saved.”

To be sure, the Division Bench then mentions in para 11 that:
Mr. Rawat states that the Wadia Institute of Himalayan Geology has already been roped in to make a study, and given their report on the on-going geological activity in the Joshimath area.”

Most forthrightly, the Division Bench then maintains so very sagaciously in para 12 that:
We are of the view that, in case experts have not been roped in, from the fields of Hydrology, Geology, Glaciology, Disaster Management, Geomorphology and landslide experts, independent experts from the aforementioned fields should also be associated with any such study, which may be undertaken by the State.”

As things stand, the Division Bench then so very succinctly observes in para 13 that:
Counsel for the petitioner states that Mr. Y.C. Mishra, erstwhile Commissioner of the Garhwal Division, is presently available. However, considering that he is very old, we are not inclined to trouble him presently. However, we direct that Shri M.P. Bisht and Shri Piyush Rautela, who made the Article dated 25.05.2010, from which, we have extracted hereinabove, should also be made parties to the Committee, which is looking into the present situation at Joshimath, so that their contribution and views are also availed of while making the report. The report should be placed before the Court in a sealed cover for its perusal before the next date.”

It cannot be glossed over that the Division Bench points out in para 14 that, “Learned counsel for the petitioner submits that the N.T.P.C. is carrying on construction activity in a tunnel made by it, even despite the ban by the State Government.”

In the same vein, we also cannot gloss over that the Division Bench then states in para 15 that:
Mr. Vashistha, who appears for the N.T.P.C., states that no construction activity, or blasting activity, is being undertaken by it ever since the disaster of 2021 took place. He further submits that the N.T.P.C. is following the order dated 05.01.2023 issued under the name of the Additional District Magistrate, Joshimath, banning all construction activity by the N.T.P.C.”

Most significantly, the Division Bench then holds in para 16 that:
The statement made by Mr. Vashistha is taken on record. We direct the State to strictly enforce the ban on construction in Joshimath area imposed on 05.01.2023.”

Finally, the Division Bench concludes by holding in para 17 that:
List this case on 24.05.2023.”

All told, we thus see that the Uttarakhand High Court on Joshimath crisis has so very rightly directed to strictly enforce construction ban as it is also the crying need of the hour. It also directed to submit report to prevent further damage. The needful must definitely be done accordingly as directed by the Uttarakhand High Court! No denying it!

Sanjeev Sirohi, Advocate,
s/o Col (Retd) BPS Sirohi, A 82, Defence Enclave,
Sardhana Road, Kankerkhera, Meerut – 250001, Uttar Pradesh

Comments

There are no comments for this article.
Only authorized users can leave comments. Please sign in first, or register a free account.
Share
Sponsor
About Author
Sanjeev Sirohi Advocate
Member since Apr 20, 2018
Location: Meerut, UP
Following
User not following anyone yet.
You might also like
Present space law framework in the country. Space has heightened the curiosity of mankind for centuries. Due to the advancement in technology, there is fierce competition amongst nations for the next space war.
The scope of Section 151 CPC has been explained by the Supreme Court in the case K.K. Velusamy v. N. Palanisamy
Co-operative Societies are governed by the Central Co-operative Societies Act 1912, where there is no State Act. In West Bengal they were governed by the West Bengal Co-operative Societies Act
Registration enables an NGO to be a transparent in its operations to the Government, Donors, to its members and to its urgent community.
The ingredients of Section 18 of the Prevention of Corruption Act, 1988 are
Drafting of legal Agreements and Deeds in India
ST Land rules in India,West Bengal
The paper will discuss about the provisions related to liquidated damages. How the law has evolved. Difference between the provisions of England and India.
A privilege may not be a right, but, under the constitution of the country, I do not gather that any broad distinction is drawn between the rights and the privileges that were enjoyed and that were taken away.
It is most hurting to see that in India, the soldiers who hail from Jammu and Kashmir and who join forces either in Army or in CRPF or in BSF or in police or in any other forces against the will of majority
Pukhraj v/s State of Uttarakhand warned high caste priests very strongly against refusing to perform religious ceremonies on behalf of lower caste pilgrims. It took a very stern view of the still existing practice of exclusion of the SC/ST community in Haridwar.
This article aims to define delay in civil suits. It finds the general as well as specific causes leading to pendency of civil suits and over-burdening of courts. This articles suggests some solutions which are pragmatic as well as effective to reduce the burden of the courts and speed up the civil judicial process.
This article deals with importance, needs, highlights and provisions of the Surrogacy Bill 2016, which is passed by the lok sabha on 19th December 2018 .
Cross Examination In Case of Injunction Suits, Injunctions are governed by Sections 37, 38, 39 to Section 42 of Specific Relief Act.
Satishchandra Ratanlal Shah v Gujarat inability of a person to return the loan amount cannot give rise to a criminal prosecution for cheating unless fraudulent or dishonest intention is shown right at the beginning of the transaction..
Dr.Ashok Khemka V/s Haryana upheld the integrity of eminent IAS officer because of his upright and impeccable credentials has emerged as an eyesore for politicians of all hues but also very rightly expunged Haryana Chief Minister ML Khattar adverse remarks in his Personal Appraisal Report
State of Rajasthan and others v. Mukesh Sharma has upheld the constitutional validity of Rule 8(2)(i) of the Rajasthan Prisons (Shortening of Sentences) Rules, 2006.
Gurmit Singh Bhatia Vs Kiran Kant Robinson the Supreme Court reiterated that, in a suit, the plaintiff is the dominus litis and cannot be forced to add parties against whom he does not want to fight unless there is a compulsion of the rule of law.
explicitly in a latest landmark ruling prohibited the use of loudspeakers in the territory without prior permission from the authorities.
The Commissioner of Police v/s Devender Anand held that filing of criminal complaint for settling a dispute of civil nature is abuse of process of law.
Rajasthan Vs Shiv Dayal High Court cannot dismiss a second appeal merely on the ground that there is a concurrent finding of two Courts (whether of dismissal or decreeing of the suit), and thus such finding becomes unassailable.
Complete Guide to Pleadings in India, get your Written statement and Plaint Drafted by highly qualified lawyers at reasonable rate.
Sushil Chandra Srivastava vs UP imposed absolute prohibition on use of DJs in the state and asked the state government to issue a toll-free number, dedicated to registering complaints against illegal use of loudspeakers. It will help control noise pollution to a very large extent if implemented in totality.
Rajasthan v/s Shri Ramesh Chandra Mundra that institutional independence, financial autonomy is integral to independence of judiciary. directing the Rajasthan Government to reconsider the two decade old proposal of the then Chief Justice of Rajasthan High Court to upgrade 16 posts of its Private Secretaries as Senior Private Secretaries
The Indian Contract act, 1872 necessities significant consideration in a few of its areas. One such area of the Indian Contract act of 1872 is where if any person finds a lost good belonging to others and takes them into his custody acts as the bailee to the owner of the good.
Government has notified 63 provisions of the Motor Vehicles Amendment Act 2019 including the ones dealing with enhanced penalties
Jose Paulo Coutinho vs. Maria Luiza Valentina Pereira no attempt has been made yet to frame a Uniform Civil Code applicable to all citizens of the country despite exhortations by it. Whether succession to the property of a Goan situated outside Goa in India will be governed by the Portuguese Civil Code, 1867
In a major legal setback to Pakistan, the High Court of England and Wales rejecting rightly Pakistan's frivolous claims and ruling explicitly that the VII Nizam of Hyderabad's descendants and India can collect 35 million pounds from Londons National Westminster Bank.
Power of Attorney and the Specific Relief Act, 1963
air pollution in Delhi and even adjoining regions like several districts of West UP are crossing all limits and this year even in districts adjoining Delhi like Meerut where air pollution was never felt so much as is now being felt.
Dr Syed Afzal (Dead) v/sRubina Syed Faizuddin that the Civil Courts while considering the application seeking interim mandatory injunction in long pending cases, should grant opportunity of hearing to the opposite side, interim mandatory injunctions can be granted after granting opportunity of hearing to the opposite side.
students of Banaras Hindu University's (BHU's) Sanskrit Vedvigyan Sankay (SVDVS) went on strike demanding the cancellation of the appointment of Assistant Professor Feroze Khan and transfer him to another faculty.
Odisha Development Corporation Ltd Vs. M/s Anupam Traders & Anr. the time tested maxim actus curiae neminem gravabit which in simple and straight language means that, No party should suffer due to the act of Court.
M/S Daffodills Pharmaceuticals Ltd v/s. State of U.P that no one can be inflicted with an adverse order, without being afforded a minimum opportunity of hearing. In other words, the Apex Court reiterated the supreme importance of the legal maxim and latin phrase titled Audi alteram partem
Ram Murti Yadav v/s State of Uttar Pradesh the standard or yardstick for judging the conduct of the judicial officer has necessarily to be strict, that the public has a right to demand virtually irreproachable conduct from anyone performing a judicial function.
Judicial Officers Being Made Scapegoats And Penalized By Inconvenient Transfers And Otherwise: SC
Desh Raj v/s Balkishan that the mandatory time-line for filing written statement is not applicable to non-commercial suits. In non-commercial suits, the time-line for written statement is directory and not mandatory, the courts have the discretion to condone delay in filing of written statement in non-commercial suits.
M/S Granules India Ltd. Vs UOI State, as a litigant, cannot behave as a private litigant, and it has solemn and constitutional duty to assist the court in dispensation of justice.
To exercise one's own fundamental right to protest peacefully does not give anyone the unfettered right to block road under any circumstances thereby causing maximum inconvenience to others.
Today, you have numerous traffic laws as well as cases of traffic violations. People know about safe driving yet they end up defying the safety guidelines. It could be anything like driving while talking on the phone, hit and run incidents, or driving under the influence of alcohol.
The legal processes are uncertain. Also, there are times when justice gets denied, and the legal outcomes get delayed. Hence, nobody wants to see themselves or their loved one end up in jail.
Arun Kumar Gupta v/s Jharkhand that judicial officer's integrity must be of a higher order and even a single aberration is not permitted. The law pertaining to the vital subject of compulsory retirement of judicial officers have thus been summed up in this noteworthy judgment.
Online Contracts or Digital Agreements are contracts created and signed over the internet. Also known as e-contracts or electronic contracts, these contracts are a more convenient and faster way of creating and signing contracts for individuals, institutions and corporate.
Re: Problems And Miseries Of Migrant Labourers has asked Maharashtra to be more vigilant and make concerted effort in identifying and sending stranded migrant workers to their native places.
Gerald Lynn Bostock v/s Clayton County, Georgia that employees cannot be fired from the jobs merely because of their transgender and homosexual identity.
This article compares two cases with similar facts, yet different outcomes and examines the reasons for the same. It revolves around consideration and validation of contracts.
Odisha Vikas Parishad vs Union Of India while modifying the absolute stay on conducting the Jagannath Rath Yatra at Puri has allowed it observing the strict restrictions and regulations of the Centre and the State Government.
Soni Beniwal v/s Uttarakhand even if there is a bar on certain matters to be taken as PIL, there is always discretion available with the Court to do so in exercise of its inherent powers.
Indian Contract Act was commenced in the year 1872 and since then, several deductions and additions have happened to the same. The following piece of work discusses about the concept of offer under the Indian Contract Act, 1872
Top